End-to-end security for capital projects
Comprehensive protection for civil engineering and construction projects, covering both physical damage to the works and third-party liability claims from groundbreaking to handover.
Coverage
Full material damage protection for the permanent and temporary works, including raw construction materials onsite.
Insures onsite construction machinery, cranes, tools, and site huts against theft, vandalism, and accidental damage.
Shields the project against legal liability for accidental bodily injury or property damage caused to members of the public.
Extended coverage for physical losses or defects that arise during the contractual post-construction maintenance phase.
The cover
Contractors all risks (CAR) insurance covers physical damage to the contract works during construction and the contractor's legal liability to third parties on and around the site. In Singapore the purchase is forced by the contract. The Public Sector Standard Conditions of Contract (PSSCOC), used on government projects, obliges the contractor to insure the works in the joint names of employer and contractor before work starts, and private forms, landlords' fit-out guides and main contractors copy the same demand.
It is not work injury compensation, professional indemnity or motor cover, and it excludes the cost of fixing defective design, material or workmanship, though damage those defects cause to sound work is inside cover. The policy runs for the contract period plus the defects liability period, on a sum insured equal to the full contract value and a third-party limit per occurrence, with a deductible per claim. The broker matches the wording to the contract clause, names the parties and sets up any annual open cover.
Who buys it
What the insurer needs to quote
Price and terms
At renewal
Questions
Clause 28.1 requires the Permanent Works, Temporary Works and unfixed materials on site to be insured in the joint names of employer and contractor for not less than the Contract Sum plus the Appendix percentage for professional fees, from before work starts until 14 days after substantial completion and through the defects liability period. Clause 27 adds Work Injury Compensation Act cover and third-party liability with the employer as additional insured and cross liability.
Only by extension. Maintenance visits cover pays for damage the contractor causes while carrying out defects work. Extended maintenance cover also pays for damage during the defects liability period from a cause on site before the completion certificate was issued. PSSCOC requires the second form, so contractors on public projects should ask for extended maintenance for the defects liability period stated in the Appendix.
The cost of replacing or repairing the defective item itself is excluded. Damage the defect causes to correctly executed parts of the works is covered, usually with a higher deductible; one public sector clause sets it at S$15,000 or 10% of the loss, whichever is higher. Claims against the designer for faulty design belong to professional indemnity insurance.
Not automatically. PSSCOC clause 28.1 excludes tools and construction equipment from the works insurance, and the CAR wording excludes mechanical or electrical breakdown of plant and vehicles licensed for road use. Plant is insured as a separate item under Section I at new replacement value, or on a contractors plant and machinery policy that follows the plant from site to site.
Section II pays damages for accidental bodily injury or property damage to third parties arising from the works, on or next to the site, plus defence costs. Damage from vibration, removal or weakening of support is excluded unless endorsed, and damage to underground cables and pipes is covered only where the contractor checked the utility plans first. Public contracts commonly set the limit at S$10 million any one occurrence.
Landlords' fit-out requirements and public sector fit-out contracts ask for it; one university tender applies a S$2,000 deductible per occurrence to fit-out and renovation contracts. The policy should name the landlord as principal, cover the landlord's existing property on a first-loss limit and run until handover. Works that touch fire protection, escape routes or compartments also need SCDF plan approval or a minor works lodgement.
Sources: BCA, PSSCOC for Construction Works 2020, clauses 27 and 28, NTU insurance clauses under PSSCOC, 21 Feb 2022, Etiqa Contractors All Risks policy wording, SCDF plan approval for fire safety works
Deep domain expertise
Built environmentWin tenders with the right cover in hand, protect every project from groundbreaking to handover, and keep workers compliant.See more →
Energy and chemicalsSecure capacity for high-consequence sites, contain environmental liability, and keep income insured through every shutdown.See more →How TRS places it
A named broker reads the current policy against how the business runs today and lists the gaps.
TRS takes the risk to the insurers with appetite for it and sets the quotes side by side: premium, deductibles, exclusions.
The same team handles mid-term changes, renewals and the claim, from first notice to settlement.
Engineering and construction
Next step
A broker reads your current schedule against your operations and replies within two working days.