Construction insurance for main contractors in Singapore: 8 covers

By the TRS broking team10 Nov 20267 min read
The short answerConstruction insurance in Singapore for a main contractor is a set of 8 policies, not one. Two are required by statute: work injury compensation and motor third party. Three are required by most contracts: contractors' all risks, public liability and a performance bond. Three are the contractor's choice: plant and machinery, design professional indemnity and delay in start-up. Each has a defined gap.

Which construction covers are compulsory and which are contractual?

Regulators check statutory covers and impose penalties. Employers check contractual covers and apply contract remedies.

CoverRequired byWho is protectedIf missing
Work injury compensation (WICA)Work Injury Compensation Act 2019Employees; the employer against their claimsFine up to S$10,000, jail up to 12 months, or both, per offence
Motor third partyMotor Vehicles (Third-Party Risks and Compensation) ActThird parties injured by site vehicles on the roadOffence; vehicle cannot be used
Contractors' all risksContract (PSSCOC, SIA, REDAS forms)The works, materials, often the employerBreach; employer may insure and deduct
Public liabilityContractThird parties injured or whose property is damagedBreach of contract
Performance bondContractEmployer, for non-performanceTender rejected
Plant and machineryContractor's choice or hire agreementOwned or hired plantUninsured loss
Design professional indemnityDesign and build contractsContractor, for design errorsUninsured design liability
Delay in start-upEmployer's choice, on the employer's CAREmployer's lost revenue from late completionUninsured financing and rental loss

In SH Design & Build v Jurong Port [2026] SGHC 159, a PSSCOC bond was 10% of the original contract sum, given as an insurer guarantee instead of cash.

Work injury compensation: the first policy on any site

The Work Injury Compensation Act 2019 requires every employer to insure employees doing manual work, and non-manual employees earning up to the salary threshold. Construction labour is manual, so the requirement covers the whole site workforce.

Compensation limits rose for accidents from 1 November 2025. Death pays between S$91,000 and S$269,000. Permanent incapacity pays between S$116,000 and S$346,000, multiplied by the percentage of incapacity. Medical expenses are capped at S$53,000 or 1 year from the accident, whichever comes first. The policy must meet these limits and the Act's conditions.

The sector's record is improving but remains the worst in Singapore. The fatal and major injury rate for construction fell from 31.0 per 100,000 workers in 2024 to 26.3 in 2025. Construction, manufacturing and transport together still accounted for more than half of fatal and major injuries. Insurers rate each contractor on its own 3 to 5 year claims record against this sector base, so a clean record is priced.

The main contractor's own WICA policy does not cover subcontractors' workers unless the wording is extended. See the next section. The work injury compensation page sets out the submission.

Want this checked against your own policies?Talk to a broker

Does the main contractor's WICA policy cover subcontractor workers?

Not by default. In Mohammed Shahid v Lim Keenly Builders [2010] SGHC 142, a subcontractor's worker fell from scaffolding and sued the main contractor as occupier. The main contractor claimed on its work injury policy. The High Court held the indemnity covered liability only to workmen in the insured's own employment. The worker was not its employee, so the policy did not respond. An endorsement that named subcontractors' workmen covered statutory compensation claims only, not common law claims such as occupier's liability.

The case shows three gaps a main contractor must close.

The court noted that the gap could be closed by amending the wording. A broker does this at placement, and reads the liability and WICA policies together rather than one at a time.

Contractors' all risks and who buys it

Contractors' all risks (CAR) insures the works under construction, materials on site and temporary works against physical loss or damage. Most forms add a third party liability section. The policy runs from site possession to practical completion, with a maintenance extension for the defects period.

Either party can buy it. Under PSSCOC and most private forms, the contractor insures in the joint names of the employer and contractor. On large or multi-phase developments, the employer often buys a project policy covering all contractors, and the contractor's contract price excludes it. The contract says which applies. If the employer insures, the contractor still needs to check the deductibles it will bear and whether its own plant is excluded.

Four settings decide whether the CAR policy pays in full.

The contractors' all risks explainer covers the clauses in detail.

Plant, motor and the fire exposure

Plant and machinery insurance covers excavators, cranes, piling rigs and generators against accidental damage on site. CAR policies usually exclude plant, or cover it only if declared with a schedule. Hire agreements often make the hirer responsible for the machine, so hired plant needs to be declared too.

Site vehicles that use public roads must carry motor third party cover. Lorries, tipper trucks and vans on a fleet policy sit here. Plant that is driven between sites, such as mobile cranes, needs motor cover for the road journey and plant cover for the work.

Fire is a rising loss cause on commercial sites. SCDF attended 471 fires at non-residential premises in 2025, up 13.5% on 2024. Electrical origin accounted for 43.5% of them. Hot works, temporary wiring and stored materials are the usual causes on construction sites. CAR wordings often include a hot works warranty, which makes the policy conditional on a permit system being followed.

Design PI and delay in start-up

A design and build contractor carries design liability. It needs professional indemnity for design work done in-house and for design subconsultants whose own PI may be too small. PI is claims-made, so cover must be in force when the claim arrives, which may be years after completion. The retroactive date should pre-date the first design and build project.

Delay in start-up (DSU) is the employer's cover. It pays the employer's lost rental income or financing costs when an insured CAR loss delays completion. It sits on the employer's project policy because the employer owns the revenue. A contractor is rarely asked to buy it, but a contractor pricing a design and build job with a fixed completion date should know whether the employer has it, because it changes how hard the employer pushes liquidated damages.

The full programme for a main contractor is 8 policies with different periods, different insureds and different triggers. A broker aligns them at tender stage so no gap sits between the WICA policy, the liability policy and the CAR policy when a subcontractor's worker is injured on a site with a fire.

Frequently asked questions

Which construction covers are compulsory and which are contractual?

Work injury compensation and motor third party are required by statute. Contractors' all risks, public liability and the performance bond are required by the construction contract. Plant and machinery, design PI and delay in start-up are chosen by the party that carries the exposure.

Does the main contractor's WICA policy cover subcontractor workers?

Not without an extension. In Mohammed Shahid v Lim Keenly Builders [2010] SGHC 142, the policy covered only workers in the insured's own employment. Statutory claims by subcontractors' workers need a named extension; common law claims fall to the public liability policy.

Who buys CAR on a project, the developer or the contractor?

The contract decides. Under PSSCOC and most private forms the contractor insures in joint names. On large developments the employer often buys a project policy for all contractors. Either way, the contractor should check deductibles and plant exclusions before pricing.

When does a contractor need design PI?

When it takes design responsibility under a design and build contract, or when it novates the employer's consultants. PI is claims-made, so the policy must run after completion and the retroactive date must cover the first project designed.

Sources

General information only, not advice on any particular policy. Cover depends on the policy wording and the insurer's terms.

More in property and projects

Property and projectsContractors’ all risks insurance for fit-outs and construction projects5 min readProperty and projectsBusiness interruption insurance: indemnity period, gross profit and what gets paid6 min readProperty and projectsMarine cargo insurance: Institute Cargo Clauses A, B and C compared5 min read

Next step

Find out what the right coverage looks like for you.

A broker reads your current schedule against your operations and replies within two working days.